Settings
Theme
Database
20 results
SEGA Genesis
Street Fighter II' Turbo (fix Haduken Color) 3.1 Final Version
By arturc1234
Hack Graphics Complete English
220 Added: 26-04-16
SEGA Master System
Out Run (Arcade Voices+Color Hack)
By arturc1234, Maxim, slogra
Hack Graphics SFX Complete English
125 Added: 26-04-12
SEGA Genesis
Street Fighter II' - Special Champion Edition 2026
By arturc1234, MDG, terpsfan101
Hack Graphics Bug Fix Cheats Complete English
190 Added: 26-03-18
SEGA Genesis
Street Fighter II' Champion Edition (March 25, 1993 & July 30, 1993 Prototypes) (fix Haduken Color)
By Master Linkuei, arturc1234
Hack Graphics Complete English
56 Added: 26-02-28
SEGA Genesis
Fatal Fury (Arcade Edition Hack)
By nolberto82, Marco Aurélio Masques Gobbi
Hack Graphics Unlocker Cheats Complete English
71 Added: 26-02-28
SEGA Genesis
Fatal Fury (Boss+Arcade Edition Hack)
By Worm, arturc1234, Marco Aurélio Masques Gobbi
Hack Graphics Unlocker Cheats Complete English
132 Added: 26-02-28
SEGA Genesis
Mortal Kombat (Boss Hack - 1 Button Fatality)
By nolberto82, Worm, arturc1234
Hack Other Complete English
115 Added: 26-02-24
SEGA Genesis
Mortal Kombat Arcade Edition (Rael 2.2 Update) (with Text Correction) (1 Button Fatality)
By Rael G.C., Master Linkuei, nolberto82, arturc1234
Hack Graphics Text Gameplay SFX Optimization Save/Load Bug Fix Complete English
85 Added: 26-02-24
SEGA Genesis
Super Street Fighter 2 – The New Challengers (Lord Hiryu With Some Colors Corrected)
By Lord Hiryu, arturc1234
Hack Graphics Bug Fix Complete English
105 Added: 26-02-24
SEGA Genesis
Mortal Kombat Arcade Edition (Rael 2.2 Update) (with Text Correction)
By Rael G.C., Master Linkuei, arturc1234
Hack Graphics Text Gameplay Music SFX Optimization Save/Load Bug Fix Complete English
65 Added: 26-02-24
SEGA Genesis
Super Street Fighter II - The New Challengers (Kamming Hack)
By arturc1234, Kamming
Hack Gameplay Bug Fix Complete English
45 Added: 26-02-24
SEGA Genesis
Super Street Fighter 2 – The New Challengers (Lord Hiryu+Kamming Hack)
By Lord Hiryu, arturc1234, Kamming
Hack Graphics Gameplay Bug Fix Complete English
72 Added: 26-02-24
SEGA Genesis
Street Fighter II Remastered [All Cheats Unlocked]
By Pyron, arturc1234
Hack Graphics Text Cheats Complete English
45 Added: 26-02-23
SEGA Genesis
Fatal Fury (Boss Hack)
By Worm
Hack Other Complete English
98 Added: 26-02-22
SEGA Genesis
Street Fighter II Remastered Retouched
By arturc1234
Hack Graphics Text Complete English
85 Added: 26-02-22
SEGA Genesis
Street Fighter II' Hyper Champoion Edition Lord Hiryu (some Colors Paletes Corrected)
By Lord Hiryu, arturc1234
Hack Graphics Text Complete English
39 Added: 26-02-22
SEGA Genesis
Street Fighter II' The World Warrior Plus Lord Hiryu (some Colors Paletes Corrected)
By Lord Hiryu, arturc1234
Hack Graphics Text Complete English
67 Added: 26-02-22
SEGA Genesis
Mortal Kombat (Boss Hack)
By Worm, arturc1234
Hack Other Complete English
72 Added: 26-02-22
Super Nintendo
Killer Instinct - Eyedol Edition Deluxe Alternate Version
By arturc1234, NinjAkira
Hack Graphics Music Complete English
216 Added: 26-02-22
Super Nintendo
Mortal Kombat 2 (Super Arcade Edition)
By nolberto82, Abystus, MottZilla, B-Zero TV
Hack Graphics Text Gameplay Cheats Complete English
2078 Added: 25-01-14